14.15 - 14.45 Deepwater Subsea Lifting Operations
Arne NestegÄrd
Significant costs are related to marine operations in the installation phase of deepwater subsea field developments. In order to establish safe operational criteria and procedures for the installation, detailed planning is necessary, including numerical modelling and analysis of the environmental conditions and hydrodynamic loads on the installed object as well as the installation equipment. This paper presents recommendations for modelling and analysis of deepwater subsea lifting operations developed for the new DNV RP-H103 [1]. During installation of subsea structures, the highest dynamic forces are most often encountered in the splash zone. Recommendations for estimation of maximum forces will be presented. For small structures and tools, installation through the moonpool of a small installation vessel is often preferred. Calculation methods for loading on structures installed through a moonpool will be presented. During intervention or installation in deep water a significant amplification of amplitude and forces can be experienced when the frequency range of vertical crane tip motion coincides with the natural vertical oscillation of the lift wire and load. Vertical resonance may reduce the operability of the operation. Simplified calculation methods for such operations are presented.