Equinor – Anna Arteeva

Askeladd and Troll Phase 3 – high rate subsea production system with 7” VXT Statoil has increased the effort to maximize the recovery from oil and gas fields. The development of gas fields and long tie-backs is gaining higher priority. Lean development poses technical challenges within flow assurance and system design. A large production pressure […]